PAST PROJECTS
- In 2025 CCxE completed 130 MW of data center projects.
- Through April, 2026 CCxE has completed 60 MW of data center with an expected total for 2026 of 220 MW of commissioned data center capacity.
- CCxE currently has 580 MW of data center work scheduled to complete in 2027. Each data center is getting larger and more dense, following industry trends.
- Our team also continues its presence on the East Campus at Ft Meade, MD (Continuously working onsite since 2014), and many other mission critical government facilities across the country.
Note: (Some larger project are on-going and span multiple years affecting the totals for specific years, our current average is 200+ MW of data center capacity commissioned per year.

Command Center, Germany
- Size: 114,000 sf
- Construction Value: $95M+
- Electrical Commissioning Agents direct to Owner
- This 114,000-square-foot facility supports tactical and theater operations along with personnel support and administration functions and includes redundant infrastructure systems and emergency power systems. This facility is built to Sensitive Compartmented Information Facility (SCIF) standards.
Operations Center, Maryland
- Size: 245,000 sf plus 40,000 Central Utility Plant
- Construction Value: $250M+
- Cx Oversight for all MEP systems
- The facility is a multi-level building that includes a 24-hour, 7 days per week Operations floor with a battle bridge, collaboration areas operations activity areas, food preparation and dining facility. The entire facility is built to Sensitive Compartmented Information Facility (SCIF) standards, with electrical and mechanical service and distribution systems, fire alarm, fire protection and suppression, IT technology infrastructure, communications and security support infrastructure. Includes standby emergency generator plant and stand-alone dedicated chiller plant with Thermal energy storage.

Data Processing Facility, Maryland*
- Size: 678,000 sf building plus 125,000 sf exterior support space.
- Construction Value: $565M+
- Cx Oversight for all MEP systems
- This facility is a very large scale data processing facility with dedicated central utility plant, primary substation, utility substations, generator plant, and administrative support spaces. Specific capacities, power densities, and equipment configurations are confidential.
Large Scale Data Center Campus, Utah*
- Size: 5M+ SF
- Construction Value: $1.2B+
- Cx for campus wide MEP systems
- State of the art very large scale data processing campus with multiple data centers, generator plants, chiller plants and technical and administrative spaces.

University Data Center
AE Design, Technology Design & Commissioning: CCxE employees assisted in the creation of a Data Center for a University's medical division. This was a primary Data Center with 10,000 SqFt of raised floor, support staff and infrastructure. The design was a Tier III Data Center.